-
5S as a basis
Done
-
Ideas for group work
Done
-
Impulses “Solving problems systematically with the Q-plus method”
Done
-
Welcome to Block 2 at Mann+Hummel
Done
-
Factory tour - Mann+Hummel
Done
-
Overview of the Lean and TPM program at Wieland
Done
-
Group exercise – Challenge: “Supporting change positively”
Done
-
lunch break
Done
-
Value stream analysis and value stream design using lean principles
Done
-
Perception, analysis, handling, and resolution of conflicts
Done
Warm up for the 5th day of training
1/14/26, 8:00 AM
-
1/14/26, 8:30 AM
(Europe/Berlin)
(30 minutes)
