-
Introduction to Mann+Hummel GmbH
Done
-
Feedback on the factory tour
Done
-
Basic principles of moderation - Structure and preparation of a moderation session and the role of the moderator
Done
-
Perception, analysis, handling, and resolution of conflicts
Done
-
Factory tour: Lean and TPM stations in the factory Part 1
Done
-
Feedback after the factory tour Good practices and potential
Done
-
coffee break
Done
-
Impulses “Solving problems systematically with the Q-plus method”
Done
-
The TPM Methodology Toolkit
Done
-
Factory tour - Mann+Hummel
Done
lunch break
11/27/25, 12:30 PM
-
11/27/25, 1:30 PM
(Europe/Berlin)
(1 hour)
